SF School Facts UK

Multi-academy trust

Cockburn Multi Academy Trust

6 schools across 1 local authority in Yorkshire and the Humber, teaching 4,186 pupils.

The trust at a glance

Schools
6
Primary
3
Secondary
3
Pupils
4,186
Average Attainment 8
46.5

across its secondaries

Average KS2 expected standard
32%

across its primaries

Across the 3 schools in the trust with comparable results, the average sits about level with the middle of schools with a similar intake. That is a fairer read on the trust than its raw results, which mostly reflect the areas it operates in.

0.60confidence interval 0.47 to 0.74

Pupil-weighted Progress 8 is 0.60 (interval 0.47 to 0.74). The interval sits entirely above zero, so this looks like a real gain rather than noise. Weighted by 515 pupils across 2 schools with a published Progress 8 score (minimum 2).

Ofsted across the trust

Outstanding1
Good3
Inadequate1
No overall grade1

5 of the trust's 6 schools carry a historic one-word grade; 1 do not. Current report cards grade separate aspects and cannot be reduced to a replacement overall score. A trust that has taken on struggling schools may carry their old grades for years. What changed.

Ofsted outcomes across this trust are mixed: 1 Outstanding, 3 Good, 1 Inadequate; 1 have no overall grade. Historic overall grades and current report cards are different systems and are not averaged.

Schools in Cockburn Multi Academy Trust

SchoolAreaOfstedAttainment 8Progress 8Compare
Cockburn Haigh Road AcademyAcademy sponsor led Leeds Good 2023
Cockburn Ingram Road AcademyAcademy sponsor led Leeds Inadequate 2024
Middleton Primary SchoolAcademy converter Leeds Good 2022
Cockburn John Charles AcademyAcademy sponsor led Leeds Report card 2026 43.8 0.470.28 to 0.66
Cockburn Laurence Calvert AcademyFree schools Leeds Good 2024
Cockburn SchoolAcademy converter Leeds Outstanding 2022 49.1 0.720.53 to 0.90

Identity snapshot: 23 August 2026. School membership, pupil totals and trust names come from the dated Get Information About Schools importer build. Results and inspection fields retain their own published periods and should not be treated as if they were measured on that date.