Multi-academy trust
Tyne Coast Academy Trust
5 schools across 3 local authorities in North East, teaching 2,936 pupils.
The trust at a glance
- Schools
- 5
- Primary
- 2
- Secondary
- 3
- Pupils
- 2,936
- Average Attainment 8
- 38.9
- Average KS2 expected standard
- 58%
across its secondaries
across its primaries
Across the 5 schools in the trust with comparable results, the average sits about level with the middle of schools with a similar intake. That is a fairer read on the trust than its raw results, which mostly reflect the areas it operates in.
Pupil-weighted Progress 8 is -0.83 (interval -0.96 to -0.70). The interval sits entirely below zero, so this looks like a real shortfall rather than noise. Weighted by 479 pupils across 3 schools with a published Progress 8 score (minimum 2).
Ofsted across the trust
2 of the trust's 5 schools carry a historic one-word grade; 3 do not. Current report cards grade separate aspects and cannot be reduced to a replacement overall score. A trust that has taken on struggling schools may carry their old grades for years. What changed.
Ofsted outcomes across this trust are mixed: 2 Good; 3 have no overall grade. Historic overall grades and current report cards are different systems and are not averaged.
Schools in Tyne Coast Academy Trust
| School | Area | Ofsted | Attainment 8 | Progress 8 | Compare |
|---|---|---|---|---|---|
| Redby AcademyAcademy converter | Sunderland | Good 2023 | — | — | |
| Ridgeway Primary AcademyAcademy sponsor led | South Shields | Report card 2026 | — | — | |
| Monkwearmouth AcademyAcademy converter | Sunderland | Good 2023 | 45.8 | -0.21-0.42 to 0.00 · not a win | |
| North East Futures UTCUniversity technical college | Newcastle Upon Tyne | No overall grade | 35.4 | -1.34-1.58 to -1.09 | |
| Walker Riverside AcademyAcademy converter | Newcastle-upon-Tyne | No overall grade | 35.5 | -0.92-1.12 to -0.72 |
Identity snapshot: 23 August 2026. School membership, pupil totals and trust names come from the dated Get Information About Schools importer build. Results and inspection fields retain their own published periods and should not be treated as if they were measured on that date.