SF School Facts UK

Multi-academy trust

Omega Multi-Academy Trust

7 schools across 2 local authorities in North West, teaching 4,881 pupils.

The trust at a glance

Schools
7
Primary
5
Secondary
2
Pupils
4,881
Average Attainment 8
39.4

across its secondaries

Average KS2 expected standard
66%

across its primaries

Across the 7 schools in the trust with comparable results, the average sits about level with the middle of schools with a similar intake. That is a fairer read on the trust than its raw results, which mostly reflect the areas it operates in.

-0.89confidence interval -1.00 to -0.77

Pupil-weighted Progress 8 is -0.89 (interval -1.00 to -0.77). The interval sits entirely below zero, so this looks like a real shortfall rather than noise. Weighted by 623 pupils across 2 schools with a published Progress 8 score (minimum 2).

Ofsted across the trust

Good2
No overall grade5

2 of the trust's 7 schools carry a historic one-word grade; 5 do not. Current report cards grade separate aspects and cannot be reduced to a replacement overall score. A trust that has taken on struggling schools may carry their old grades for years. What changed.

Ofsted outcomes across this trust are mixed: 2 Good; 5 have no overall grade. Historic overall grades and current report cards are different systems and are not averaged.

Schools in Omega Multi-Academy Trust

SchoolAreaOfstedAttainment 8Progress 8Compare
Bradshaw Primary SchoolAcademy converter Warrington No overall grade
Burtonwood Community Primary SchoolAcademy converter Warrington Good 2023
Chapelford Village Primary SchoolAcademy converter Warrington Report card 2026
Park Road Community Primary SchoolAcademy converter WARRINGTON Report card 2025
Westbrook Old Hall Primary SchoolAcademy converter Warrington Report card 2026
Alsop High SchoolAcademy sponsor led Liverpool Report card 2026 28.2 -1.72-1.90 to -1.53
Great Sankey High SchoolAcademy converter Warrington Good 2023 50.5 -0.32-0.47 to -0.17

Identity snapshot: 23 August 2026. School membership, pupil totals and trust names come from the dated Get Information About Schools importer build. Results and inspection fields retain their own published periods and should not be treated as if they were measured on that date.